So technically if you are installing vinyl plank flooring onto concrete you already have a subfloor.
Concrete floor prep for vinyl plank flooring.
It can be constructed from wood plywood plastic or concrete.
Tape a 3 foot square piece of scrap vinyl to the concrete with duct tape sealing the edges tight.
Prep your subfloor so that it s clean dry and level within 3 16 inch change per 10 feet.
Vinyl plank flooring is water resistant and if it has a wpc core it s waterproof so it won t be damaged by the off gassing.
Test the floor for moisture.
Self leveler is available in powder and pre mixed form and is used to create a flat smooth surface in flooring projects.
If a floor plank and underlayment or adhesive will not fit under the door casing cut the casing with a backsaw about 1 16 inch above the level of the new flooring.
And this time it went so much smoother.
If your concrete subfloor was just poured you ll need to allow it to properly cure for a minimum of 60 days before your luxury vinyl flooring installation begins.
Use a self leveler on low spots and or sand high spots of wood or concrete.
Preparing a concrete subfloor for luxury vinyl flooring concrete is a common subfloor material and in general it s easy to prepare for a luxury vinyl flooring installation project.
Preparing the floor for installation of any flooring is the key to a great job especially when installing vinyl planks.
Newly poured concrete off gases water vapor and typically needs from 120 to 150 days to dry out before it s ready to accept flooring according to milliken company.
Vinyl planks are a great option if you want durable flooring but don t have a ton of installation experience.
However laying vinyl flooring over concrete requires a bit more preparation.
Don t sand vinyl flooring as it may contain asbestos.
A subfloor is the bottom layer of any floor.
Leave the vinyl in place for 72 hours.
Before installing your vinyl flooring whether the subfloor of your work area is hardwood or concrete one crucial step is to make sure the subfloor is level and clean.
If a floor plank and underlayment or adhesive will not fit under the door remove the door and trim it with a circular saw about 1 8 inch above the level of the new flooring.